Gold Mining News Hubb
Advertisement
  • Home
  • Gold News
  • Mining News
  • Contact us
No Result
View All Result
  • Home
  • Gold News
  • Mining News
  • Contact us
No Result
View All Result
Gold Mining News Hubb
No Result
View All Result
Home Mining News

Fission applies to build uranium mine and milling facility in Canada

admin by admin
May 1, 2023
in Mining News


The company started front-end engineering design (FEED) for the PLS project’s progress. Credit: Kletr/Shutterstock.com.

Fission Uranium has applied for a licence with the Canadian Nuclear Safety Commission (CNSC) to build a uranium mine and milling facility at its PLS uranium project in Athabasca Basin, Saskatchewan.

Simultaneously, the company started front-end engineering design (FEED) for the PLS project’s progress.

This includes completing geotechnical drilling, hydrogeological holes, test pits, and geophysical surveys for downhole vertical seismic profiling (VSP).

A feasibility study confirmed a construction time of three years at the site, which is expected to have a life of ten years.

The life of mine (LOM) production is estimated to be 90.9 million pounds (41,231.5t) of U₃O₈.

The study also estimated that the average cost of operations is $10 per pound of U₃O₈.

Fission Uranium president and CEO Ross McElroy said: “I am very pleased to confirm that the construction licence application for the PLS project has been submitted. Additionally, we have successfully completed our winter field programme, and the front-end engineering design work is well underway.

“Our development path to production is progressing on schedule and, at the same time, the fundamentals for uranium continue to strengthen in line with the global reactor construction boom.”

Spread out across more than 31,000 hectares, the PLS project is 100% owned and operated by Fission Uranium.

This project hosts the Triple R deposit, which is said to be the largest high-grade deposit of uranium at shallow depths starting at 50m below the surface.

The deposit is part of a 3.1km mineralised trend at PLS and is open from several directions.

All the zones within the deposit are claimed to have the potential of adding to the resource estimate.



Source link

Previous Post

Enhancing Africa’s Critical Minerals Value Chain

Next Post

Which Jobs Will Be Most Impacted by ChatGPT?

Next Post

Which Jobs Will Be Most Impacted by ChatGPT?

Recommended

Which Countries Pollute the Most Ocean Plastic Waste?

February 17, 2023

Animation: Berkshire Hathaway’s Holdings Since 1994

October 13, 2022

Don't miss it

Gold News

Kano farmers helpless as sand mining destroys farmlands

September 28, 2023
Mining News

Buenassa plans to build $350m copper-cobalt smelter in Congo

September 28, 2023
Gold News

Glencore latest to cut coal jobs owing to Transnet’s dismal performance

September 28, 2023
Gold News

Top 7 Developments in Libya’s Gas Industry

September 28, 2023
Gold News

State to pay N395,000 package to corps members

September 27, 2023
Mining News

Pan American Silver sells projects in Argentina and Peru

September 27, 2023
gold mining-66

© Gold Mining News Hubb All rights reserved.

Use of these names, logos, and brands does not imply endorsement unless specified. By using this site, you agree to the Privacy Policy and Terms & Conditions.

Navigate Site

  • Home
  • Gold News
  • Mining News
  • Contact us

Newsletter Sign Up

No Result
View All Result
  • Home
  • Gold News
  • Mining News
  • Contact us

© 2022 Gold Mining News Hubb All rights reserved.