Gold Mining News Hubb
Advertisement
  • Home
  • Gold News
  • Mining News
  • Contact us
No Result
View All Result
  • Home
  • Gold News
  • Mining News
  • Contact us
No Result
View All Result
Gold Mining News Hubb
No Result
View All Result
Home Gold News

B2Gold to expand solar capacity at Fekola as targets 30% GHG cut by 2030

admin by admin
January 28, 2023
in Gold News


Low angle view of technician walks with investor through field of solar panels, Alternative energy to conserve the world’s energy, Photovoltaic module idea for clean energy production.

B2GOLD is to expand solar power generation facilities at its Mali mine Fekola as part of a strategy to reduce scope 1 and 2 emissions 30% by 2030.

The 30MW plant will be expanded by 22MW which will reduce greenhouse gas emissions 24,000 tons a year and reduce heavy fuel oil consumption by an average 7.6 million litres annually, the company said.

Construction of the Fekola solar plant expansion project is expected to begin in the third quarter of 2023 and is estimated to be complete in the third quarter of 2024, it added.

Otjikoto, B2Gold’s Namibia mine, operates a 5.8MW solar plant. As with Fekola, Otjikoto’s maintains a fully autonomous hybrid power plant.

Commenting on its 2030 emission targets, B2Gold said it was “… pursuing initiatives to increase the proportion of renewable energy sources, electrify operations, and improve energy efficiency”.

B2Gold is investing heavily in Fekola. Earlier this month, it announced total capital expenditure of $352m at the mine this year. The outlay includes $138m in growth capital related to expansion at the Anaconda and Dandoko extension projects and underground mine development.

Total production for B2Gold in the 2022 financial year was 1.03 million oz – the third consecutive year of one million plus ounces in production. It has targeted output of one million to 1.08 million oz for the current year.

Commenting on the prospect of expanding, B2Gold said the engineering study was expected during the second quarter. It would be based on processing at least four million tons a year in oxide resources.

“Initial analysis indicates that the combined Fekola and Fekola Regional (Anaconda area) processing facilities could have the potential to produce more than 800,000 oz of gold per year commencing as early as 2026,” the company said.



Source link

Previous Post

U.S. Conveys Heightened Interest in Senegal as Large-Scale Projects Take Off

Next Post

Mkango gets environmental clearance for Malawi project

Next Post

Mkango gets environmental clearance for Malawi project

Recommended

Amplats’ CEO Natasha Viljoen on leaving SA, and the importance of power

March 3, 2023

Atlas Lithium signs lithium concentrate MOU with Japan’s Mitsui

January 19, 2023

Don't miss it

Gold News

PDP’s Peter Mbah wins Enugu governorship election

March 22, 2023
Mining News

Visualizing the Link Between Unemployment and Recessions

March 22, 2023
Mining News

Argentina lithium exports surge 234% in 2022

March 22, 2023
Gold News

Potstirrer Mantashe: SA’s mines and energy minister, and master of under-delivery

March 22, 2023
Gold News

Like it or Not, Coal Still Has an Important Role to Play in South Africa Today and Tomorrow

March 22, 2023
Gold News

Nigerians are 95th happiest people worldwide

March 21, 2023

gold mining-66

© 2022 Gold Mining News Hubb All rights reserved.

Use of these names, logos, and brands does not imply endorsement unless specified. By using this site, you agree to the Privacy Policy and Terms & Conditions.

Navigate Site

  • Home
  • Gold News
  • Mining News
  • Contact us

Newsletter Sign Up

No Result
View All Result
  • Home
  • Gold News
  • Mining News
  • Contact us

© 2022 Gold Mining News Hubb All rights reserved.